Page 56 - Catalogue_UK_2018
P. 56

INLET VALVES            100 OD     Compact 99T  Compact 99T   Delayed Action  Compact 99B  Quieto  Compact 95L



                    Side                     •                                             •          •
                 Entry
                    Bottom                   •          •           •          •

                    Hydraulical              •          •           •          •           •          •
                 Closure
                    Mechanical

                    3/8" brass                          •                                  •          •
                 Connection  1/2" brass                 •           •                                 •


                    1/2" plastic             •          •                      •                      •
                    Length (mm)             81,5        75,5        92         75,5       112         112
                 Dimensions  Width (mm)     62,9        53          66         53          69         50

                    Height                  284       235 ~ 344   240 ~ 330    282        256         270
                    (from connection axis) (mm)

                 Certifi  cations             •          •           •          •                      •




                      Guarantee (years)      10         10          10         10          10         10






            Water saving





                                                              The average UK household consumes 150 litres of water
                                                              per person, per day.
                                                              22% of this consumption is associated to fl ushing the WC.

                                                              Our range of delayed action inlet valves contribute to saving
                                                              water with two functions.

                                                              - the fi rst is to delay the inlet valve from re-fi lling
                                                                the cistern until the fl ush valve has closed.
     TECHNICAL EQUIPMENT TECHNICAL EQUIPMENT                  - the second is to maintain a consistent volume
                                                              Saving water from being wasted during the fl ushing cycle.


                                                                of water entering the cistern.

                                                              As the cistern refi lls with speed,
                                                              the water spills over into the box, rapidly
                                                              lifting the fl oat for a quick, reliable
                                                              shut off.








                                                               54                                                                                                              55
   51   52   53   54   55   56   57   58   59   60   61